
Add to Cart
1.5ton/H 1500kg 100hp Horizontal Gas Oil Fired Steam Boiler For Printing And Dyeing
General Introduction
WNS series skid-mounted gas and oil fired boiler is classical shell type boiler, contains boiler proper; burner; water level/ pressure control system, economizer, exhaust flue system, valves, etc. The complete system is well mounted on the base, user only need to supply water; electricity, fuel.
Model | WNS Series Oil Gas Steam Boiler |
Structure | Wet Back Fire Tube Packaged Three Pass |
Fuel | oil, gas, light oil, heavy oil, natural gas, lpg, lng, cng, diesel, biogas etc |
Capacity | 1-20 ton per hour |
Pressure | 0.7/1.0/1.25/1.6 Mpa (7/10/12.5/16 Bar) |
Temperature | 170/184/194/204 Celsius |
Application | Chemical, food and brewery, pharmaceutical, package plant, textile dyeing and printing industry, swimming pool, hospital,school,clothing industry etc. |
Boiler characteristics
• Special Structure and High Efficiency: All system is well mounted on the base, its system is portable. The users no need to consider the pipeline installation, wire connection. After receiving the goods, just supply water; electricity, fuel. It is equipped with renowned brand burners (BALTUR, RIELLO, HOFAMAT, ECO FLAM), also finned tube type economizer can ensure boiler's thermal efficiency up to 95%.
• High Quality Control: In manufacturing processes, we has adopting steel strength test, automatic steel cutting/ plate rolling/ welding, 100% x-ray welding check, magnetic particle check c-scan ultrasonography Ultrasound check, fluorescent penetrating check, hydraulic (water) pressure test, boiler thermal efficiency test,etc, to make sure all finished products is qualified.
• Automatic Safe Operation: WNS series boiler is equipped automatic burner ignition, automatic water-level control, automatic pressure control, automatic interlock chain stop protection, free settable working pressure, free settable ON/OFF time, visible system's working states on screen.
• Easy Maintenance: WNS series boiler uses full water back tube-sheets instead of traditional dry back tube-sheet, can avoid the dry-fire broken, reduce the range of steel cooling contraction and hotting expansion. Also, we adopting openable smoke-boxes, users can replace the broken fire-tubes conveniently.
Technical Parameter
Model | Rated | Rated | Rated | Thermal | Fuel Consumption | Equipment Power | Weight | ||
Capacity (t/h) | Pressure (Mpa) | Temperature (C) | Efficiency (%) | Light oil (Kg/h) | Natural gas (Nm³/h) | Burn light oil | Burn gas | (t) | |
WNS1 | 1 | 0.7/1.0/1.25 | 170/184/194 | >90 | 45-100 | 18-100 | 1.5 | 1.5 | 4 |
WNS1.5 | 1.5 | >90.2 | 101.73 | 123.47 | 2.2 | 1.5 | 5 | ||
WNS2 | 2 | 1.0/1.25/1.6 | 184/194/204 | >90.2 | 137.09 | 165.97 | 2.2 | 3 | 8 |
WNS3 | 3 | >91 | 205.75 | 249.6 | 7.5 | 7.5 | 9 | ||
WNS4 | 4 | >91 | 272.3 | 329.5 | 9 | 7.5 | 13 | ||
WNS5 | 5 | >91.5 | 134-402 | 80-500 | 17.2 | 15 | 15 | ||
WNS6 | 6 | >91.5 | 134-402 | 80-500 | 15 | 15 | 17 | ||
WN8 | 8 | 1.25/1.6/2.5 | 194/204/225 | >91.6 | 523.4 | 631.5 | 26 | 22 | 21 |
WNS10 | 10 | >91.6 | 212-890 | 150-1085 | 26 | 22 | 22 | ||
WNS12 | 12 | >91.8 | 915.5 | 1090 | 26 | 22 | 27 | ||
WNS15 | 15 | >91.8 | 931.5 | 1094.4 | / | / | 34 | ||
WNS20 | 20 | >92 | 1380.33 | 1598.44 | / | / | 45 | ||
Note: Parameter is for reference only, we can design the boilers based on customers’ needs. |
Free-Installation
Before the shipment, complete boiler system is well skid-mounted on the basement, also we have done the pipe(valves) connection and wire connection. After receiving the boiler, no need installation/ assembly. Just join the boiler to water/ gas/ electricity. Comparing with other traditional boilers in the market, our boiler does save lots of cost/ energy/ time in installation. The additional, the entire boiler system is portable.
When industrial steam boiler goes out of the factory, it is composed of three parts: the main boiler, the chimney and the pipeline system. The main body and the chimney have been manufactured in the factory, and the supporting pipeline valves and instruments of the main boiler have been installed randomly, and then transported to the site to assemble the main body and the chimney.On the spot connect the air source, power supply and water pipeline to start the test.Greatly shorten the installation cycle, and can guarantee the quality of boiler.